NEW RELEASE - DINCEL 200P TWIN HOLE
Published 12 April 2021
Addressing the need for double horizontal bars where required, we've enhanced our 200mm profile with a bit of a facelift by giving you twin holes.
Twin dedicated holes ensure that horizontal bars are always kept separated from each other during concrete pour / vibrator use.
The triangular service channels (developed originally for chasing services) are now cut by the dual web holes in order to be infilled with concrete, leading to solid concrete throughout the entire profile.
Standard production of the twin hole variant commences 26 April 2021 for NSW customers.* To ensure your existing builds are not compromised the single hole variant will remain in production until 30 June 2021.
Over the coming weeks your Account Manager will be touching base to ensure the transition to the new twin hole 200 main profile seamlessly integrates with both your scheduled and future builds. We’ll also be providing an Addendum to the Construction Manual, helping you make the most of our new-look profile.
To find out more, request a demonstration or product sample visit us at www.dincel.com.au
* Other States and distributors to follow based on the balance between demand and stock holding.